Construction Supervision

At RAS Engineering, providing construction supervision during a building restoration project is crucial for ensuring the quality, safety, and compliance of the work being performed. Here’s how we typically conduct this process, focusing on inspections and testing for quality assurance:




1. Pre-Construction Phase

Project Kickoff Meeting:

  • Conduct a kickoff meeting with the project team, including contractors, subcontractors, and key stakeholders.

  • Review project plans, specifications, timelines, and quality standards.

Preparation of Inspection Plan:

  • Develop a detailed inspection plan outlining the stages of construction that require inspections and testing.

  • Define the criteria for acceptance and the methods for inspection and testing.





2. Construction Phase

Regular Site Visits:

  • Perform regular site visits to monitor ongoing work and ensure compliance with project specifications.

  • Document site conditions, progress, and any issues observed during visits.

Daily Inspections:

  • Conduct daily inspections to verify that construction activities adhere to the approved plans and specifications.

  • Inspect materials delivered to the site to ensure they meet specified quality standards.

Critical Stage Inspections:

  • Perform inspections at critical stages of the restoration process, such as before concrete pours, installation of structural elements, and completion of critical repairs.

  • Ensure that each stage is completed correctly before proceeding to the next phase.

Testing for Quality Assurance:

  • Implement a testing schedule to evaluate the quality of materials and workmanship.

  • Common tests include:

    • Concrete Testing: Slump tests, compressive strength tests, and air content tests.

    • Steel Testing: Tensile strength tests, weld inspections, and coating thickness measurements.

    • Masonry Testing: Mortar strength tests, brick/block density tests, and bond strength tests.

    • Waterproofing Testing: Water penetration tests and adhesion tests.

Non-Destructive Testing (NDT):

  • Use non-destructive testing methods, such as ultrasonic testing, bonding testing, and infrared thermography, to evaluate the integrity of structural and waterproofing components without causing damage.





3. Quality Control Documentation

Inspection Reports:

  • Prepare detailed inspection reports documenting findings, any non-compliance issues, and recommended corrective actions.

  • Include photographs, sketches, and test results to support the inspection findings.

  • Send inspection logs to the building official.

Test Reports:

  • Compile test reports for all materials and workmanship evaluations, ensuring that they meet the project’s quality standards.

  • Compare test results against specified criteria and document any deviations.

Issue Tracking and Resolution:

  • Maintain a log of non-conformity reports identified during inspections and testing.

  • Work with contractors to resolve issues promptly and document the corrective actions taken.






4. Coordination and Communication

Regular Meetings:

  • Hold regular meetings with the project team to discuss inspection findings, test results, and any quality-related concerns.

  • Ensure open communication channels to address issues and coordinate corrective actions effectively.

Stakeholder Updates:

  • Provide regular updates to stakeholders, including project ownership, about the status of inspections and testing.

  • Share key findings, issues, and resolutions to keep all parties informed.







5. Final Inspections and Project Closeout

Final Inspection:

  • Conduct a comprehensive final inspection to verify that all work meets the project’s specifications and quality standards.

  • Check that all identified issues have been resolved satisfactorily.

Punch List:

  • Prepare a punch list of any remaining minor issues or incomplete items that need to be addressed before project closeout.

  • Ensure that all punch list items are completed and verified.

Documentation:

  • Compile and provide all necessary documentation, including inspection reports, test reports, as-built drawings, and warranties, to ownership.

  • Ensure that maintenance recommendations and any required future inspections are clearly documented.







6. Post-Construction Follow-Up

Warranty Inspections:

  • Schedule and perform follow-up inspections during the warranty period to ensure that no new issues have arisen and that the repairs are performing as expected.

  • Address any warranty claims promptly and ensure proper resolution.

By following this rigorous approach to construction supervision, RAS Engineering ensures that all aspects of the building restoration project are executed to the highest quality standards. This commitment to thorough inspections and testing helps prevent issues, ensures compliance, and ultimately delivers a safe and durable restoration project.

Read our insights for South Florida Buildings

Watch answers to common questions from building owners and managers in AskRAS

Schedule an online meeting